New cyclist and pedestrian bridge across the Thames in Reading

The new Christchurchbridge is a steel cable-stayed bridge with a total length of 122 metres and a clear span of 69 metres. The bridge is carried by a steel pylon with a height of 37 metres. A total of 560 tons of steel were installed. The bridge was manufactured and delivered to the construction site as a “DIY” kit of nine bridge sections, a pylon and five approach slabs.

Date: